Building a Bison-Style 250TR — Part 6: Marking, Drilling and the Levers

English
スポンサーリンク
スポンサーリンク

In this article

  • The clutch cable gets its re-route too — same trick as the throttle cables in Part 5
  • Positions before holes — how the switch boxes’ places on the new bar are fixed by the parts whose positions can’t move
  • Drilling the bar — pilot hole first, angle checked while adjustment is still possible, then opened up
  • Lever position and height — including the one thing about the Z2 grips that forces a compromise
スポンサーリンク

Where Part 5 left us

The Bison bar is on the Kawasaki 250TR, and the throttle cables have been re-routed down the right side of the steering head to win back their slack.

the throttle cables back on the carburettor, from Part 5

First job in this part is the same favour for the clutch cable — and then the careful business of deciding exactly where everything sits on the new bar.

Step 1: The clutch cable re-route

Like the throttle cables, the clutch cable runs slightly tight at full lock on the wider bar, so it gets a new path. Draw the cable (off the bike since Part 3) down and out of its guide, and bring it past the ignition coil to the left side.

the clutch cable coming out

past the ignition coil, to the left

It passes under the switch box wiring coupler — remember that coupler; the switch wiring gets a re-route of its own later in the build.

under the switch box coupler

Then up through the guide on the left, and parked there, ready to meet its lever again in Step 5.

Step 2: Fixing positions — the throttle holder is the reference

Everything that follows serves one task: drilling the anti-rotation holes for the switch boxes (Part 4 explained why they matter). A hole fixes a switch box forever, so positions come first — and positions are decided by working from the parts whose place on the bar is already absolute.

On the right, that reference is the throttle holder. Slide it fully home, then back it off just a few millimetres, and temp-fix it there: the throttle tube’s inner flange must not touch the bar end, or the throttle action suffers. A few mm of float is plenty — you can’t see the gap; you have to feel for it.

the throttle holder, temp-fixed

(This bike’s holder has its anti-rotation lug broken off, so it clamps fully. An intact lug won’t let you tighten it down — but it will still hold a position well enough to serve as the reference.)

Step 3: Marking the kill switch hole

Butt the kill switch up against the throttle holder and set its angle. The reference for the angle: with the steering straight, the starter button’s face should be vertical — check it by eye from both sides.

setting the kill switch against the holder

Mark the lug’s position, then centre-punch it. A drill bit will skate on a bare curved tube; the punch gives it a home.

centre-punched

Step 4: The left side — the grip is the reference

On the left, the fixed reference is the grip itself. The grips going on are Z2-type, with little shark-fin ribs — a pattern you almost never see on a current model.

the Z2-type grips

And grips are handed, which is worth stating plainly: the right grip’s bore is larger, by exactly the thickness of the throttle tube it has to fit over. The left fits the bare bar.

left and right grip bores: not the same

The Z2s are hard rubber, and the fitting method matches: a thin coat of grip glue inside the grip, let it dry completely first, then drive the grip on. (Glue a grip on wet and the glue never dries at all.) Unlike the throttle side, the left grip goes fully home, until its inside meets the bar end. Honestly? These are hard, and fitting them is a fight. Brace yourself.

the left grip going on, fully home

Step 5: Marking the dimmer switch hole

With the grip on, the left switch box’s sideways position is decided. Temp-fix the box and set its angle the same way as the right: the indicator switch’s face vertical.

the left switch box, temp-fixed

Angle set, draw a line along the box’s lever-holder-side face, and mark the centre of the relief curve on the box’s back — that centre is where the lug sits.

the line and the centre mark

Then take the box off and transfer the lug’s position onto the bar itself, working in millimetres from the bar end — the lug is recessed inside the box, so it can’t be marked directly, but measured from the end it becomes straightforward. The position is easy. The angle is the whole game: get the angle wrong and, in the original’s words, it’s genuinely not funny.

the marks transferred to the bar

centre-punched, ready to drill

Step 6: Drilling

Pilot hole first, with a thin bit, on the punch mark. The bar is a curved tube — drill gently, or the bit snaps.

the pilot hole going in

Deburr the pilot hole, inside and out, working a deburring tool around it. Then — before enlarging anything — offer the switch box up and check the angle. At pilot size, the hole can still be eased up or down to correct it.

deburring

checking the angle at pilot size

Angle right, open the hole up. On this build a small rotary tool did the enlarging — quick, and easy to adjust with. Check the angle as you go, deburr at the end, and fit the box.

opening the hole up with a rotary tool

the left switch box, fitted

The right side’s kill switch gets exactly the same treatment (no photos — same drill, literally), and the throttle holder goes back to its proper position and is fixed.

throttle holder refitted, lever in place

Step 7: Lever holder position — a small compromise

The rule for the clutch lever holder: fix it where the fully pulled lever just meets the grip. The Z2 grip complicates that — its bar-end is flared, so with the holder hard against the switch box, the lever strikes the flare and can’t pull all the way.

the lever meeting the grip’s flare

Two honest options: leave a small extra gap between holder and switch box, or snug it up and accept the lever’s last bit of travel. There’s no law that a clutch lever must pull to the very end — and this time, looks won: the holder sits snug against the switch box. Your bike, your call. For now it’s only temp-fixed either way; final tightening waits until both lever heights are matched.

positioning the holder

the holder fixed against the switch box

Step 8: Clutch cable on, and lever heights matched

Connect the re-routed clutch cable to the lever, set the free play with the engine-side adjuster nuts, and finish with the fine adjustment at the perch adjuster.

setting the clutch cable at the perch

One small, real tip to file away: when you set that perch adjuster, don’t leave its cable slot facing up. A slot facing the sky funnels rainwater straight down inside the cable — and a water-filled cable corrodes, then snaps.

Finally, the master cylinder goes back on (temp-fixed), and the two levers’ heights are matched: stand in front of the bike and sight across them — both at the same angle, roughly level, which is where most hands pull easiest.

both levers, matched, from the front

Lever height is not a detail. Finger length, build, seat height — every rider is different, and a lever angle adjusted to the rider makes operation measurably easier; a bad angle tires the hand. The original’s closing word on it: what matters is easy operation, and sometimes the right adjustment ignores the theory.

The cockpit is built. Next, the front end gets its fender and the build turns to the bodywork.

Next: Part 7 — the kit starts going on.

Japanese originals

This article is the English edition of the shop’s Japanese build diary, first published in February 2017:


Notes

  • This article was written by Lu for the English edition of the Centrum Motorcycle workshop archive. The Japanese originals are linked above; every fact, figure and step here comes from those posts — nothing has been added from outside sources.
  • The 250TR is Kawasaki’s air-cooled single-cylinder retro roadster. The “Bison” body kit by Gang Parts restyles it after Kawasaki’s F11 Bison, the 250cc two-stroke trail bike of the 1970s.

コメント

タイトルとURLをコピーしました